Basement carpet installation in a newly finished Toronto basement: new drywall, paint and trim, a bare concrete slab, and a soft grey cut pile carpet to finish the room.
Tackless strip went down around the perimeter of the slab first, then pad wall to wall inside it. The grey carpet was laid over the pad, stretched tight and tucked at the baseboards, finishing at the doorway and the foot of the new stairs.
Carpet went in after the drywall, paint and trim were done. That keeps construction dust off the new floor and lets the room go straight into use once the install is finished.